Skip to content
English
My AccountCart

How NuVasive Reduced Their Lead Time and Developed an Internal Process with ArtiosCAD

NuVasive, Inc. (NASDAQ: NUVA) is the leader in spine technology innovation, with a mission to transform surgery, advance care, and change lives. 

NuVasive logo

The Challenge:

Minimize time spent communicating with suppliers and lack of internal control over the package design process.

The Solution:

Implement ArtiosCAD for structural design.

The Benefits:

Gained more control over the package design process and design lead time was reduced.

Case Study Summary

NuVasive, Inc. (NASDAQ: NUVA) is the leader in spine technology innovation, with a mission to transform surgery, advance care, and change lives. The Company’s less invasive, procedurally integrated surgical solutions are designed to deliver reproducible and clinically proven outcomes.

Creating safe packaging and maintaining product sterility are paramount. NuVasive previously spent considerable time communicating back and forth with suppliers. Without an internal packaging design process, the overall time to develop packaging was greatly increased. They wanted to create a process that is both time and cost efficient.

After implementing ArtiosCAD, NuVasive experienced more control over the package design process, updates became more efficient, and design lead time was reduced.

Read the Story

The NuVasive PSP process and the way they draft purchase specs for suppliers has increased in speed.

Collaboration has been enhanced internally and externally with suppliers in particular.


Design lead time has been reduced.


Design lead time has been reduced.

Smiling woman with short hair